Carnival ELATION
Carnival Cruise Line, ALMACO Group Freeport, BAHAMAS
Scope of work :
Full refurbishment of deck 9 aft lounge to new 36 cabins area. Works such as: Background outfitting works /new steel bulkheads, insulation, piping works), construction of Raised Floor, Construction of 36 on board built cabins. Work: Steel, Piping, Electrical, Interior. Before project fabricate ADA outisde ramp in Prydwen Productionm in Keila, Estonia. As well provide all Piping, Steel and Electrical materials from Prydwen side.
Manpower :
124 workers, including on site management team. Prefabrication: 18 workers
Duration :
Prefabrication in December 2019 ; Dry Dock in March 2020