MSC Bellissima
STX Europe, Maser Engineering
Saint-Nazaire, FRANCE
Scope of work:
Installation of corridor walls and ceilings + construction of cabins and finalizing works to cabins. Including cleaning and touch-up works for both cabins and corridors. Total area of 68 cabins
Manpower:
4-12 workers
Duration:
August 2018 – May 2019